Customization: | Available |
---|---|
Department: | Plastic Greenhouse |
Span: | Multi |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The arch greenhouse can be used for the planting of flower and vegetable, also can be used as the auqaculture greenhouse for the flower,vegetable and tree. As the ornamental greenhouse, it also can be used as the ecological restaurant, exhibition, tourism and scientific research, as well as the culture of aquatic and livestock.
Characteristics
This kind greenhouse is popular because of its low cost, the beautiful curved shape and the sight flow. It need less steel but has a good performance in the heat preservation.
Item | Span width | Section width | Gutter height | Ridge height |
Multispan film greenhouse | 8.0-10.0m (The size could be customized according to your requirements) |
4.0-5.0m (The size could be customized according to your requirements) |
3-4.5m (The size could be customized according to your requirements) |
5-6m (The size could be customized according to your requirements) |
Item | Technical data |
Wind load | 0.4KN/m2 |
Snow load | 0.35KN/m2 |
Max row of rainfall | 140mm/h |
Planting hanging load | 15kg/m2 |
Greenhouse constant load | 10kg/m2 |
We will supply free spare parts if any problem occurred in 12 months after shipment.
1. How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 10-60days.
2. How long is the warranty period?
Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3 years, etc.
3. Is your company foreign trade company or manufacturer?
we are manufacturer.
4. Can you supply sample?
Small parts can be supplied, but you should pay the express.
5. Can your company supply greenhouse design?
Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract.
6. How to install greenhouse ?
First we prepare the material and export.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you.
7. When installing, what cost should we pay?
our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication